Bond Scope of Work

·
Repair subgrade and re-pave asphalt parking lot areas
· Remove/replace broken concrete bus drive area
· Upgrade exterior lighting for improved safety and security
· Add a security vestibule at front entry of building including reception office, remove larger planter
· Renovate all locker room spaces, boys and girls
· Replace dishwasher and walk-in freezer/refrigerator
· Replace existing bleacher in small gym with motorized bleachers
· Replace ceiling tiles, repair/replace ceiling grid throughout building, where needed
· Repaint exterior perimeter doors
· Remove/replace HVAC equipment and boilers as required due to age
· Upgrade HVAC controls from pneumatic to electronic
· Upgrade electrical service and panels due to age/deterioration
· Replace all galvanized water piping to copper due to dielectric disintegration
· Upgrade exterior lighting for improved safety and security at Field House
· Replace walkway bridges at Field House
· Replace entire roof on Field House
· Renovate coaches office area at Field House
· Replace lockers and benches in each locker room, and replace ceiling tiles at Field House
· Upgrade fire alarm system at Field House
· Remove/replace HVAC equipment as required due to age at Field House
· Upgrade electrical service and panels due to age/deterioration at Field House
· Replace all galvanized water piping to copper due to dielectric disintegration at Field House

Current Activities 

· Project is complete.

· The 11 month walk-through to review for possible warranty items occurred on July 26.

  